On the east side of Travis Heights, Woodland Avenue no longer reaches East Riverside. TxDOT has permanently closed Woodland under I-35 to vehicles. Drivers now make U-turns on the frontage road at Riverside or Oltorf, and a pedestrian-only bridge is planned to take Woodland's place over the lowered highway. That is the first change on a schedule that now surrounds the neighborhood. Highway reconstruction on the east edge, a light-rail guideway on the north edge, and rail tracks plus two retail and hotel projects on the west edge all have dates that run to about 2033.
Buyers comparing central Austin neighborhoods already know Travis Heights from the listing photos: the hills, the oaks and Blunn Creek. These schedules don't show up in the photos. The construction reaches every edge of the neighborhood, but the planned stations and new storefronts cluster on one side. That makes which block you buy on, and how long you plan to own, part of the price question.
The east edge runs on TxDOT's calendar
TxDOT's Lady Bird Lake segment of the I-35 Capital Express Central project runs from Holly Street to Ben White Boulevard. It began construction in early 2025, and the department expects to finish in 2033, weather permitting. Balfour Beatty Construction is the contractor. The finished highway will have two managed HOV lanes in each direction, a rebuilt Lady Bird Lake bridge, a single-point urban interchange at Riverside Drive, the pedestrian bridge at Woodland, and bike and pedestrian paths along the corridor.
Riverside is where the schedule is most detailed. Community Impact reported that crews began rebuilding the Riverside Drive bridge over I-35 on July 15, 2026. KXAN reported that two lanes in each direction would stay open during the work. TxDOT's Riverside fact sheet puts work on the north side of the bridge in mid-2026 and the intersection rebuild in mid-2027. Demolition of the existing bridge, construction on the south side and the switch to the new interchange follow from 2028 through 2033. TxDOT notes that these milestones can change.
The driving changes are already in place. Since February 16, 2026, access to the northbound frontage road just north of Riverside has been closed, and Community Impact reported the closure is expected to last through 2029. Drivers coming off Riverside now head down the southbound frontage road, U-turn at Woodland and take the Riverside bypass lane to go north. On the segment page, TxDOT also lists the existing east pedestrian path at Lady Bird Lake and the north sidewalk on Riverside as closed through 2029.
Walking to the lake from this edge has also changed. The Riverside Drive pedestrian ramp to the boardwalk is closed through 2029, though the staircase and boardwalk stay open apart from intermittent work. The Trail Conservancy has announced a two-week closure of the south-shore boardwalk in early December while crews demolish and rebuild the northbound frontage-road bridge, and said it would confirm the exact dates later in November. In its guidance for the segment, TxDOT says neighbors should expect daytime, nighttime and weekend work along with noise, dust, vibration, lighting, and more traffic on frontage roads and neighborhood streets.
Neighborhood landmarks on the frontage road are affected too. The design that Austin Monitor walked through in 2024 spared Whip In and Travis Heights Wine & Spirits, but both lose their front parking.
The north edge gets a guideway, and the station went elsewhere
Austin Light Rail Phase 1 crosses Lady Bird Lake on a new bridge and then splits on the south shore. One branch runs west and down South Congress to Oltorf. The other runs east along East Riverside to Yellow Jacket. The Record of Decision, issued in January 2026, covers a 15-station line and adopts the design option that eliminates a Travis Heights station. Under that design, the East Riverside guideway still runs to Travis Heights Boulevard and then continues at grade to I-35.
When ATP first proposed dropping the stop, Austin Monitor reported the agency's reasons: the hillside made a station harder to build, and the stop would have taken 2 acres from Norwood Park. The same report described elevated tracks along Riverside that meet the top of the hill near Travis Heights Boulevard. The final environmental study says that dropping the station avoids using parkland on the Norwood Tract in Town Lake Metro Park.
That leaves three stops at the edges of the neighborhood. In ATP's January 2025 alternatives chapter, Waterfront station sits at East Riverside Drive and the Barton Springs Road extension. SoCo station is on South Congress between Academy Drive and James Street, and Oltorf station is between Oltorf Street and Long Bow Lane. All three are on the west side of the neighborhood, along Congress or near where Congress meets the lake.
The timing matches I-35's. KUT reported in July that construction is set to begin in 2027 and that first trains are targeted for 2033. In October, KXAN reported that the project still needs more than $4 billion in federal Capital Investment Grant funding, that the FTA estimates a construction grant in summer 2027, and that ATP says it is on schedule.
ATP has said it expects the line to raise property values near stations. That is a forecast for station areas. Since the station closest to the middle of Travis Heights was removed, blocks east of Travis Heights Boulevard would get the guideway without a stop of their own.
The west side has the dated projects
Along Congress, the projects with announced dates are retail and hospitality. At 2315 S. Congress, on the northeast corner of Congress and Oltorf, SomeraRoad is repositioning Twin Oaks Shopping Center as a 90,000-square-foot retail, dining and service project. The Austin American-Statesman reported in August that this plan replaces an earlier Trammell Crow concept for 959 homes, which the company dropped. Hoodline reported a target opening of summer 2028.
Farther north, Hyatt announced in April a renovation that turns South Congress Hotel at 1603 S. Congress into The Standard, Austin, with a planned opening in spring 2027.
The largest site on this side is the former Austin American-Statesman property at 305 S. Congress. In 2022 the City Council approved plans for 1,400 apartments, 1 million square feet of office space and a hotel there, KUT reported. The plan also includes 8.12 acres of park and plaza and about a third of a mile of rebuilt Butler Trail. The Statesman reported in October 2025 that litigation had stalled the redevelopment, so the park and trail have no construction date.
Lining the schedule up against a holding period
Taken together, the dates read like this:
- 2026: Riverside bridge work is underway. Woodland is closed to cars under I-35, and the northbound frontage access north of Riverside is closed.
- 2027: The Riverside intersection rebuild begins, light-rail construction is scheduled to start, and The Standard, Austin, is planned to open.
- 2028: Twin Oaks targets its opening, and the Riverside interchange work moves into its final phase.
- 2029: The frontage-road access closure, the east lake path closure and the boardwalk ramp closure are scheduled to end.
- 2033: TxDOT's anticipated I-35 completion and the target year for first trains.
Now compare that list with your own plans. A buyer who closes this winter and sells in five years leaves around 2031. That owner lives through the Riverside rebuild, the start of rail construction and the 2029 detours, then sells before the highway is finished or the trains run. A buyer who stays ten years or more gets the lowered highway, the Woodland pedestrian bridge, the trail connections and walkable stations at SoCo and Oltorf.
Location inside the neighborhood changes the math too. A house near the frontage road or along Riverside east of Travis Heights Boulevard is close to most of the construction and farthest from the planned stations. A house on the interior hills is farther from the work, and it is a walk or short ride from the Congress-side stations once they open. Houses near Congress will see rail construction on the avenue, but they are also closest to the stations and the new storefronts.
What the October market adds
City-level numbers are the most recent available. KXAN, reporting Unlock MLS data on November 11, put the City of Austin's October 2026 median sale price at $550,000 and its inventory at 5.7 months. The same report found that homes across the metro spent 76 days on market in October. With that much inventory, a buyer has time to tour a block at rush hour, walk the U-turn route at Woodland, and compare a house near the frontage road with one a few streets in before making an offer.
For sellers, the same numbers mean more competition. A listing on an east-edge block in 2027 or 2028 competes with interior listings and with the rest of the city's supply while Riverside is being rebuilt next door. For more on how offers come together here, see our guide to buying in Travis Heights without overpaying, and for the neighborhood's walkable north-south routes, our August look at the Blunn Creek corridor.
FAQ
Is there a light-rail station inside Travis Heights? No. The January 2026 Record of Decision adopted the design without a Travis Heights station. The nearest planned stops are Waterfront, SoCo and Oltorf.
Will Woodland Avenue reopen to cars under I-35? TxDOT lists Woodland under I-35 as permanently closed to vehicles. The plan calls for a pedestrian-only bridge at Woodland.
When does the frontage-road detour at Riverside end? TxDOT lists the northbound frontage-road access closure north of Riverside through 2029.
If you're weighing a Travis Heights house against these dates, Team West Real Estate can walk the block with you, map it against the I-35 and rail schedules, and compare it with interior and Congress-side options in our Travis Heights neighborhood guide. Request a Specialist and tell us how long you plan to own. We'll start there.